2017/04/15 – Beltline and Eg

Rain should peter off soon, time to get a move on. I’ve seen old pictures of hydro poles that delivered power to streetcars, but didn’t know they still existed in this form..

Beltline Trail at Dufferin still expects users to frogger their way across 4 traffic lanes.

Missed connection. Getting over the Allen forces a detour.

Not really missed connections, just private hoarding of land parcels.

Hard to capture with a cell cam, but there’s some smoke on the water going on here. The high point of my trip so far. Literally, not figuratively.

While the war of words continues over a Scarborough Subway, talk about other rapid transit corridors like Jane has fallen off the map.

Changes.

Final shots of the day, delayed by low battery. Lower Humber, waiting for things to burst into lush green.


Date: April 15, 2017
Length: 15.7 km
Theme: Railway, Hydro, Riverine


Metroscapes Walks
Toronto | Kitchener-Waterloo-Cambridge | Hamilton | Guelph

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s